Nidus Ontology V3
Select any passage to ask a question about it or to propose replacement wording.
Nidus Ontology V3
Foundation: Ontology · Glossary · Relationship Map
Each concept is its own document, listed below, and uses the same four-part template:
- Definition — what the concept is, in a short paragraph.
- Ontological Position — which kind of thing it is, and how it relates to other concepts. Relationships are written in plain English with crow's-foot notation in parentheses.
- Properties — what the concept carries, grouped by role.
- Rules — the invariants that must hold, each stated once.
Crow's-foot notation: || exactly one · o| zero or one · |{ one or more · o{ zero or more. Read left to right.
Concepts
- Constraint
- Assignment
- Certification
- Catalog
- Communication
- Contact
- Equipment
- Facilitator (Ontology)
- Feature (Ontology)
- Inspection (Ontology)
- Lead (Ontology)
- Mitigator
- Species Count
- Observation (Ontology)
- Pool
- Pool Test
- Sample Label
- Prevention
- Product
- Review
- Route (Ontology)
- Signal (Ontology)
- Situation
- Site (Ontology)
- Suppression
- Technician
- Trap Instance
- Trap Configuration
- Trap Sample
- Trap Station
- Treatment (Ontology)
- Work Order
Concepts not yet written
These are named by ontology relations and linked from other documents, but their concept documents are stubs and carry no definition yet.
Data Layers
Every object above sits under three layers of data. The layers are a rule about how data reaches the record, not objects in it: there is no Data Layer entity, and none is created.
Type 1 — raw capture. Audio, photograph, geometry, freeform text, and metadata as captured. Immutable, and it never produces an object on its own. A photograph of a ditch changes nothing until someone reads it.
Type 2 — structured extraction. What a person takes out of raw capture: the Observation, the Feature, the Facilitator, the Assignment parameters, the change to a property. Only Type 2 creates or changes an object, and every object in this ontology is reached that way.
Type 3 — analysis. Insight derived from the two below it: probability weighting, trend, performance. It changes no object. It informs planning and priority, and where it is acted on, the acting is Type 2 work with its own object.